Wednesday, 18 April 2018

Sunday, 8 April 2018

Got the laser cut plates placed together this weekend. Ready to be welded.





This week I will be getting all the bits ready for engineering shop to tig weld.

Wednesday, 4 April 2018

Got all the laser cut plates for the drive system yesterday.

Friday, 30 March 2018

All the laser cut plates for both track drive system have been ordered and will have them next week. Then they will be off the the engineering shop to be tig welded. After that I can start working on the middle bar to connect the 2 track drive units together and start planning the base plate for the body.

I have designed a jig for alignment and setting the angle for the tensioner parts.This jig is set up to be able to do both left and right idle arm units for the track drive.

Update on the CNC machine is that it will be in my country 6th April.